Status of this page: P0 draft. Plain-text formulas; verify the Sharpe standard-error expression against Lo (2002) or Bailey and Lopez de Prado (2012) before implementation.
1. Core metrics
2. Uncertainty in the Sharpe ratio
Under iid normal returns the standard error of the per-period Sharpe is approximately sqrt((1 + SR^2 / 2) / (T - 1)). Skewness and excess kurtosis widen it. Verified example: T = 756 daily observations, annualised Sharpe 1.5 gives a standard error of about 0.58 (annualised), so a two-standard-error band runs from roughly 0.3 to 2.7. Report the interval, not the point estimate. Autocorrelation matters for strategies with smoothed or illiquid marks: positive autocorrelation inflates annualised Sharpe computed with sqrt scaling. Compute Sharpe on non-overlapping aggregated returns as a check. For selection effects use the deflated Sharpe ratio in Backtest bias taxonomy.3. P&L attribution for a trading book
A useful decomposition for a market-making or arbitrage desk:- Edge at fill: (fill price - mid at fill) x side; positive for passive fills.
- Adverse selection / post-fill move: (mid after horizon - mid at fill) x side.
- Inventory carry: P&L on inventory held between fills from market moves.
- Hedge P&L and hedge slippage: hedge instrument gains and execution cost.
- Financing, borrow, and fees.
- Model/other residual.
4. Factor and benchmark attribution
- Regress strategy returns on market, size, value, momentum, and sector factors to find unintended exposure. A high alpha t-statistic alone is not enough given multiple testing.
- For ETF and index strategies, attribute against the relevant index and the basis.
- Report exposure over time, not only the full-sample beta.
5. Reporting standard
Every backtest report should include: universe and period, data source and availability lags, cost model, number of variants tried, gross and net returns, Sharpe with a confidence interval, drawdown profile, turnover, capacity estimate, and sensitivity to costs and latency.Points to verify
- The exact standard-error expression with non-normality adjustment (Mertens/Lo form) before use in code.
- Convention for annualisation used by the desk (252 vs 250 days).
Sources
- Lo (2002), The Statistics of Sharpe Ratios, Financial Analysts Journal.
- Bailey and Lopez de Prado (2012), The Sharpe Ratio Efficient Frontier, Journal of Risk.
- Numerical example checked by calculation.

